Realization in the President Palace was completed in November 2008 by GIG.
The Press Room was equipped with soft light fixtures made by Kino Flo. To provide the constant color temperature which is necessary for cameras, which usually appear in a large number in any press room, we instead:
All fixtures were mounted on a special truss, which was designed and mounted in such a way to fit into the room environment / background. The fixtures themselves and the way they were suspended were made to minimize their effect on other devices used in the room such as seamless plasma, audio system and TV cameras.